Jiaxing Dexun Co.,Ltd. 86-573-82716900 wendyl@dexun-hardware.cn
GB Standard Black M3 Grade 4.8 arc Weld Steel Stud

GB Standard Black M3 Grade 4.8 arc Weld Steel Stud

  • High Light

    Grade 4.8 steel weld stud

    ,

    M3 steel weld stud

    ,

    GB m3 weld stud

  • Product Name
    Steel Weld Stud
  • Material
    Steel
  • Specification
    M3*20
  • Size
    M3
  • Standard
    GB/902-2008
  • Packing
    Customized
  • Type
    Round
  • Usage
    Welding
  • Place of Origin
    China
  • Minimum Order Quantity
    10000pcs
  • Price
    USD
  • Packaging Details
    Woven Bag
  • Delivery Time
    35days
  • Payment Terms
    T/T
  • Supply Ability
    100,00pcs per month

GB Standard Black M3 Grade 4.8 arc Weld Steel Stud

Description

 

Process of stud welding
The basic process of stud welding is starting arc welding arc upsetting cooling solidification.
In this process, welding current, welding time and arc shape have great influence on welding results.

 

Product name Stel weld stud
Material Steel
Color Black
Specification M3*20
Size M3
Standard GB/902-2008
Grade 4.8
Usage Welding
Service OEM /ODM
Type Round
Certificate ISO9001
Payment Term TT 50% Deposit

 

Stud welding

The arc starting of stud welding is controlled by the program. First, the screw contacts the workpiece. When the start button is pressed, the welder first provides a small current, and then the screw is lifted to establish an arc between the aluminum pole at the tip of the screw and the workpiece. 

When the arc is established, the welding machine automatically enters into high current welding: the end of the stud begins to melt, and the molten pool is formed on the workpiece. The arc burning process is called welding arc stage. When the set welding time is reached, the arc is extinguished, and the stud is immersed in the bath under the action of external force (generally spring force). Enter the forging stage. Then, the bath is cooled and solidified naturally to complete the welding process.

 

 

Factory Diaplay

 

GB Standard Black M3 Grade 4.8 arc Weld Steel Stud 0

 

GB Standard Black M3 Grade 4.8 arc Weld Steel Stud 1

 

1.Q: Are you a factory or trading company?
A: We are a professional high quality fastener factory.

 

2.Q: What are the payment terms?
A: 1.TT. TT30% in advance for deposit,then we arrange mass production, you can pay 70% balance before shipment.

 

3.Q: What is your leading time or delivery time?
A: We compete a 40HQ'container after received deposit 35-45days.

 

4.Q: Do you have discount for bulk order?
A: Yes, of course, the more you buy, the bigger discount you can get.